What are the federal procurement requirements for FEMA?
General Federal Procurement Standards 1. Oversight Maintain oversight to ensure contractors perform according to terms, conditions, and specifications of contract 2. Necessity Avoid unnecessary/duplicative supplies and services; limit acquisitions to what is necessary to perform the scope of work (no “stockpiling”)
What are the activities eligible for FEMA reimbursement?
The following list the sub-grantee direct administrative activities that are eligible for reimbursement under FEMA’s Public Assistance (PA) Grant Program. In order to be eligible the labor for these activities must be charged to a specific project.
What are the direct administrative costs of FEMA?
DIRECT ADMINISTRATIVE COST — Daily Time Summary Identifying and/or generating a list of damaged sites. Discussing the need for immediate funding and/or collected supporting documentation. Collecting damage data, invoices, estimates, and/or support documentation.
When do you get reimbursed by FEMA for DAC?
DAC are reimbursed by FEMA at the closeout of each specific project. Note: Always check the latest FEMA guidance documents for the most recent information.
What are the FEMA schedule of equipment rates?
The rates on this Schedule of Equipment Rates are for applicant-owned equipment in good mechanical condition, complete with all required attachments.
How much does a hp unit cost FEMA?
Search the 2019 Schedule of Equipment Rates Cost Code Capacity or Size HP Unit 2019 Updated Rate 8010 41 CFM to 10 hour $1.62 8011 103 CFM to 30 hour $9.86 8012 130 CFM to 50 hour $12.49 8013 175 CFM to 90 hour $20.98
What are the eligible emergency protective measures for FEMA?
Eligible Emergency Protective Measures 1 FEMA Public Assistance Program. In accordance with section 502 of the Robert T. Stafford Disaster Relief and Emergency… 2 Eligible Assistance. Under the COVID-19 Emergency Declaration described above, FEMA may provide assistance for emergency… More
General Federal Procurement Standards 1. Oversight Maintain oversight to ensure contractors perform according to terms, conditions, and specifications of contract 2. Necessity Avoid unnecessary/duplicative supplies and services; limit acquisitions to what is necessary to perform the scope of work (no “stockpiling”)